Skip to main content
. 2021 May 26;6:27. doi: 10.1038/s41536-021-00138-y

Table 2.

Model assumptions.

Model assumptions Assumption
Hours of operation per day 16 h (2 × 8-hour shifts)
Manufacturing days per year 320
Batch success rate 100%
Ownership strategy Rental
Air grade B