Table 6.
PMG estimation results.
| Variable | Coefficient | Std. Error | T-Statistic | Prob. |
|---|---|---|---|---|
| Long Run | ||||
| LNENG | 0.228 | 0.037 | 6.164 | 0.000 |
| LNTRA | 0.133 | 0.023 | 5.683 | 0.000 |
| LNCAP | 0.327 | 0.022 | 14.678 | 0.000 |
| LNLAB | 0.200 | 0.063 | 3.196 | 0.002 |
| LNFDI | 0.008 | 0.003 | 2.423 | 0.016 |
| LNHCI | 1.807 | 0.220 | 8.231 | 0.000 |
| ECT |
-0.167 |
0.032 |
-5.233 |
0.000 |
| Short Run | ||||
| ΔLNENG | 0.065 | 0.024 | 2.737 | 0.006 |
| ΔLNTRA | 0.049 | 0.026 | 1.874 | 0.061 |
| ΔLNCAP | 0.116 | 0.021 | 5.605 | 0.000 |
| ΔLNLAB | -0.004 | 0.075 | -0.049 | 0.961 |
| ΔLNFDI | 0.000 | 0.001 | 0.231 | 0.817 |
| ΔLNHCI | -0.621 | 0.179 | -3.467 | 0.001 |
| Constant | -0.188 | 0.064 | -2.932 | 0.004 |