Skip to main content
. 2021 Jun 9;193(7):400. doi: 10.1007/s10661-021-09159-y

Table 2.

A proposal for unified cost criteria to be used in the cost-efficiency assessments of novel monitoring methods

Cost factor Definition
Type I: Price of data Price of data if bought from third parties
Type II: Equipment and supplies Cost of equipment, cost of expendable supplies per sample
Type III: Personnel Personnel costs needed to process one sample or a study site
Type IV: Time Time spent on sampling and data management
Type V: Other costs E.g., transport of samples, training the personnel and keeping up their proficiency, maintaining a website for citizen science observations
Type VI: Savings

Savings gained by replacing an existing method

Required analysis: worktime (% compared with the present method), required skills (compared with the present method) and total costs (compared with the present method)