Table 2.
A proposal for unified cost criteria to be used in the cost-efficiency assessments of novel monitoring methods
| Cost factor | Definition |
|---|---|
| Type I: Price of data | Price of data if bought from third parties |
| Type II: Equipment and supplies | Cost of equipment, cost of expendable supplies per sample |
| Type III: Personnel | Personnel costs needed to process one sample or a study site |
| Type IV: Time | Time spent on sampling and data management |
| Type V: Other costs | E.g., transport of samples, training the personnel and keeping up their proficiency, maintaining a website for citizen science observations |
| Type VI: Savings |
Savings gained by replacing an existing method Required analysis: worktime (% compared with the present method), required skills (compared with the present method) and total costs (compared with the present method) |