Skip to main content
. 2021 May;10(5):1307–1316. doi: 10.21037/tp-21-17

Table 3. Need of unplanned surgery/unplanned RVOT stent.

Patient Stent in mm Number of stents Intervention DCI Class Stent patency (days)
1 4 1 Early repair 0.42 III 13
2 3.5 2 PVP/RVOT-stent 0.53 IV 7
3 4 1 Shunt 0.63 IV 71
4 3.5 1 Shunt 0.62 IV 0
5 3 1 Shunt 0.6 IV 30
6 3 1 Shunt 0.62 IV 77
7 4 2 PVP/RVOT-stent 0.18 II 12
8 4 1 Early repair 0.5 IV 16
9 4 2 Shunt 0.25 II 7
10 3.5 1 Shunt 0.57 IV 77
11 3.5 1 Shunt 0.5 IV 19
12 4 2 Shunt 0.52 IV 7
13 3.5 2 Shunt 0.5 IV 150

Stent in mm, stent in millimeter; PV-perforation, pulmonary valve perforation; DCI, ductal curvature index.