Skip to main content
. 2021 May 7;22(6):71–82. doi: 10.1002/acm2.13254

Table 1.

PTV volumes used in the planning/optimization study.

Structure

Plan 1 Spherical

Volume (cm3)

Plan 2 Irregular

Volume (cm3)

Plan 3 Jack

Volume (cm3)

PTV1 0.54 1.20 1.50
PTV2 1.96 0.98 1.44
PTV3 0.19 0.73 1.11
PTV4 0.97 1.01 1.83
PTV5 8.00 1.67 1.28