Skip to main content
. 2021 Jun 7;14(11):3133. doi: 10.3390/ma14113133

Table 2.

Parameters of the abrasion tests performed on the samples collected at plants A and B.

Sample ID Processing Unit Duration
(min)
Plant A
(2–40 mm)
Plant B
(4–26 mm)
Raw Untreated sample -
CM Concrete Mixer 240
Abr. 60 Sieving drum 60
Abr. 120 Sieving drum 120