Skip to main content
. 2021 Jun 14;4:98. doi: 10.1038/s41746-021-00468-7

Fig. 1. Expected net cost savings as a function of the effectiveness constant, for the three different schedules.

Fig. 1

Under “Method”, “L1LR” denotes L1 regularized logistic regression. “Schedule” indicates the days of the week on which the provider works (M = Monday, T = Tuesday, W = Wednesday, R = Thursday, F = Friday). Panel a corresponds to a Monday-only schedule, panel b corresponds to a Monday/Wednesday schedule, and panel c corresponds to a Monday - Friday schedule.