Skip to main content
. 2021 Jun 17;12:3732. doi: 10.1038/s41467-021-23554-6

Table 1.

Assumptions for CDR technologies in this analysis.

BECCS DAC
Capital cost $5870/kW ($568/t-CO2/year net removal capacity) $614/t-CO2/year net removal capacity
Investment lifetime 60 years 30 years
Fuel cost Based on FASOM-GHG model Electricity prices are calculated endogenously in model; natural gas prices are scenario specific
CO2 intensity −1.18 t-CO2/MWh N/A
Biomass use 14.8 MMBtu/MWh N/A
Electricity use N/A 0.3 MWh/t-CO2
Natural gas use N/A 5.6 MMBtu/t-CO2
Fixed O&M cost $177/kW/year ($17.1/t-CO2/year) $41/t-CO2/year net removal capacity
Variable O&M cost $19.4/MWh ($16.4/t-CO2/year) excluding fuel and CO2 transport/storage $8/t-CO2 excluding heat, electricity, and CO2 transport/storage
Availability factor Monthly values range from 60 to 80% 90%
CO2 transport/storage cost Endogenous; varies by location Endogenous; varies by location
Electricity coproduct 0.85 MWh/t-CO2 N/A

Reference BECCS assumptions are based on Johnson and Swisher32, and DAC assumptions are based on Larsen et al.31. All values are expressed in 2018 US dollars. DAC parameters are normalized to net removal at the plant per metric ton of CO2.