Skip to main content
. 2021 Jun 18;22:556. doi: 10.1186/s12891-021-04446-8

Table 1.

Summary of results in loading the graft up to failure: Stiffness of graft-bone-screw construct, Maximum load at failure and Total graft displacement in both groups with their corresponding P values

Measured parameter LSTIS HSTIS P value
Stiffness of graft-bone-screw construct (N/mm) 107.9 ± 6.4 123.4 ± 27.7 P = 0.152
Maximum load at failure (N) 292.8 ± 163.4 360.2 ± 155.6 P = 0.415
Total graft displacement (mm)a 9.6 ± 1.42 7.3 ± 1.14 P = 0.086

aIt is defined as the difference between initial position of graft after preconditioning step of loading and its position at failure point, along bone tunnel direction