Table 6.
Codification | Concrete A | Concrete B | ||||||
---|---|---|---|---|---|---|---|---|
CEM I | SA | SB | VA | CEM I | SA | SB | VA | |
Control | 250 | 350 | ||||||
SA25VA25 | 125 | 62.5 | 62.5 | 175 | 87.5 | 87.5 | ||
SB25VA25 | 125 | 62.5 | 62.5 | 175 | 87.5 | 87.5 | ||
SA40VA25 | 87.5 | 100 | 62.5 | 122.5 | 140 | 87.5 | ||
SB40VA25 | 87.5 | 100 | 62.5 | 122.5 | 140 | 87.5 | ||
SA25VA40 | 87.5 | 62.5 | 100 | 122.5 | 87.5 | 140 | ||
SB25VA40 | 87.5 | 62.5 | 100 | 122.5 | 87.5 | 140 | ||
SA40VA40 | 50 | 100 | 100 | |||||
SB40VA40 | 50 | 100 | 100 |