Skip to main content
. 2021 Feb 19;30(7):2061–2070. doi: 10.1007/s11136-021-02781-w

Fig. 3.

Fig. 3

Standard error of measurement (SE(θ)) of the full item bank, short form, and CAT of the PROMIS Peer Relationships item bank, using the U.S. model parameters and the distribution of the Dutch sample T-scores plotted as histogram