Table 6.
Equipment | Power (W) | Operation time (h) | Energy consumed (kWh) | Energy consumed for 1 M doses (kWh) | Total CO2 emission (kg) | Total emission for 1 M doses (kg CO2) | References |
---|---|---|---|---|---|---|---|
Disinfectant | |||||||
Continuous stirred-tank reactor | 4,500 | 24 |
|
2,260 |
|
920 | [43] |
Vaccine vials manufacturing | |||||||
Furnace (water removal) | 7,083 | 24 |
|
26,600 |
|
1,700 | [48] |
Furnace (dry process) | 18,333 | 24 |
|
44,300 |
|
2,790 | |
Furnace (wet process) | 33,041 | 24 |
|
80,100 |
|
5,585 | |
Syringes for vaccination manufacturing | |||||||
Hydraulic moulding | 213 | 24 | 5.12 | 5,120* * It's also include the needle manufacturing and syringe sterilisation energy |
2.09 | 2,090 | [52] |
Electric moulding | 159 | 24 | 2.55 | 2,550 | 1.04 | 1,040 | |
Hybrid moulding | 106 | 24 | 3.83 | 3,830 | 1.57 | 1,570 | |
All healthcare facilities for 1,000 doses/d (Vaccination centre with a staff of 5 persons) | |||||||
Lights (fluorescent) | 11 | 6 | 0.066 | 66 | 0.41 kg of CO2/kWh of energy | [68] | |
Mobile phone charger | 5–20 | 8 | 0.04–0.16 | 160 | |||
Ceiling fan (CD, AC) | 30–100 | 10 | 0.3–1.0 | 1,000 | |||
All healthcare facilities | |||||||
Water pump | 100 | 6 | 0.6 | 600 | 0.41 kg of CO2/kWh of energy | ||
Computer | 15–200 | 4 | 0.06–0.8 | 800 | |||
Heating and air conditioning | 1,000–1,500 | 4 | 4–7.5 | 7,500 | |||
Others (TV, Audio/Visual device) | 2–30 | 8 | 0.016–0.24 | 240 | |||
Vaccination centre laboratory equipment | |||||||
Vaccine refrigerator (165 L) | 40–500 | 4 | 0.16–2 | 2,000 | 0.41 kg of CO2/kWh of energy |