Dam development portfolios over the planning horizon 2016–2037.

Name Description No. of dams Total capacity (GW)
L-T-C Mekong L-T-C Mekong
Reference Build all dams (business as usual) 146 236 28.46 63.63
Stop-Main Build dams on tributaries only 139 229 20.61 55.79
Stop-Planned Stop building all planned dams (from 2020 onwards) 119 203 19.24 53.70
Stop-All Stop building all planned and under construction dams (from 2020 onwards) 111 195 18.21 52.67
2016 Dams commissioned by the end of 2016 53 108 9.29 29.58

Overview of the total number of dams, and corresponding installed capacity, for the business-as-usual plan (Reference) plus three additional dam development portfolios. The last row reports information on dams operational in 2016. Both number of dams and total capacity are reported for all countries falling within the Mekong basin and for Thailand, Laos, and Cambodia only (L-T-C). Data were retrieved from refs. 46,35 and processed to filter dams that have either storage capacity >0.1 Mm3 or installed capacity >1 MW.