Skip to main content
. 2021 Jul 7;79:125. doi: 10.1186/s13690-021-00647-8

Fig. 2.

Fig. 2

Depicts staffing, set up, and flow of two testing lanes, serviced by one tent. Participants slowly pulled forward into the testing lane and were stopped next to the tent. The testing assistant confirmed participant identifiers and verified match with administrator, who handed off pre-made testing kit with materials necessary for specimen collection. The tester explained procedures to the participant and collected samples, with support from testing assistant as needed. The float ensured the specimens were stored correctly, and the administrator logged that testing was complete as the participant exited the testing bay