Table 7.
Uncertainty budget summarizing the significant components contributing to the combined standard uncertainty (RComb) for characterized plutonium isotope amount ratios of the 244Pu Spike
Uncertainty component | Description | Assessment type | Relative standard uncertainty (%) of contributing components | |||
---|---|---|---|---|---|---|
n(239Pu)/n(244Pu) | n(240Pu)/n(244Pu) | n(241Pu)/n(244Pu) | n(242Pu)/n(244Pu) | |||
RVarW | Standard uncertainty of within-laboratory measurement variability | A | 0.30 | 0.15 | 1.04 | 0.16 |
RVarB | Standard uncertainty of between-laboratory measurement variability | A | 1.3 | 0.47 | 10.3 | 0.46 |
RCRM | Average standard uncertainty derived from certificate values for mass spectrometry calibration CRMs | B | 0.06 | 0.06 | 0.06 | 0.06 |
RCorr | Estimated standard uncertainty of mass spectrometry measurements | B | 0.28 | 0.09 | 1.07 | 0.15 |
δDecay | Standard uncertainty associated with decay corrections for measured values | B | 0.00 | 0.00 | 0.03 | 0.00 |
RComb | Relative combined standard uncertainty (%) k = 1 | 1.5 | 0.53 | 10.4 | 0.51 |
The relative combined standard uncertainty (bold) is calculated from the listed uncertainty components summed in quadrature Assessment Type “A” denotes evaluation by statistical methods; “B” denotes evaluation by other methods