Table 4.
Hours required to train MT-CNN and MT-HCAN models. A node hour is the total time budget spent to train the models on Summit nodes, and Wall time is the actual time from the start of training the models to the end.
| Single | Bagging | Partitioned 1 | Partitioned 2 | ||
|---|---|---|---|---|---|
| MT-CNN | Node hours | 2.32 | 776.39 | 1601.85 | 1361.39 |
| Wall time Hours | 2.32 | 2.33 | 0.48 | 2.08 | |
| MT-HCAN | Node hours | 11.01 | 3668.98 | 12,120.37 | 11,514.35 |
| Wall time hours | 11.01 | 11.01 | 3.64 | 12.45 |