Table 2. Coefficients from the linear spline model with a knot on 31st July.
Estimate | Std. Error | t value | Pr(>|t|) | |
---|---|---|---|---|
Intercept | 5.301 | 0.096 | 55.378 | 0.000 |
Slope estimate, pre-mask | 0.042 | 0.007 | 5.858 | 0.000 |
Slope estimate, with masks | -0.023 | 0.017 | -1.342 | 0.190 |
Change in slope, introduction of mandatory masks | -0.065 | 0.022 | -2.953 | 0.006 |
Residual standard error: 0.239 on 29 degrees of freedom; Multiple R-squared: 0.582 Adjusted R-squared: 0.554; F-statistic: 20.21 on 2 and 29 DF, p-value: < 0.001.