Table 2.
Optimization solutions based on 3 scenarios of MRMCCM-DC
| Culture | Scenario 1 | Scenario 2 | Scenario 3 |
|---|---|---|---|
| Consensus opinion | 3.5 | 4.2 | 2.8 |
| Down-adjustment | (0, 0, 1, 2.5, 5.5) | (0, 0, 1.2, 3, 6.6) | (0, 0, 0.8, 2, 4.4) |
| Up-adjustment | (1.5, 0, 0, 0, 0) | (1.8, 0, 0, 0, 0) | (1.2, 0, 0, 0, 0) |
| Minimum total consensus cost: | 32 | 42.24 | 23.04 |