Table 3.
Optimization solutions based on 3 scenarios of -MRMCCM-DC
| Culture | Scenario 1 | Scenario 2 | Scenario 3 |
|---|---|---|---|
| Consensus opinion | 16 | 12.8 | 19.2 |
| Down-adjustment | (0, 0, 6, 12) | (0, 0, 4.8, 9.6) | (0, 0, 7.2, 14.4) |
| Up-adjustment | (12, 5, 0, 0) | (4, 0, 0, 0) | (6, 0, 0, 0) |
| Minimum total consensus cost: | 31.35 | 20.06 | 45.14 |