Skip to main content
. 2021 Jul 23;31(2):261–291. doi: 10.1007/s10726-021-09752-z

Table 4.

Optimization solutions based on 3 scenarios of TB-MRMCCM-DC

Culture Scenario 1 Scenario 2 Scenario 3
consensus opinion 18 13.8 22.4
u+ (0, 1, 8, 15) (0, 2, 7.8, 13.6) (0, 0, 8, 16.2)
u- (2, 0, 0, 0) (0, 0, 0, 0) (4.2, 0.2, 0, 0)
v+ (0, 0, 0, 5) (0, 0, 0, 3.6) (0, 0, 0, 6.2)
v- (12, 5, 0, 8) (10, 4, 0.2, 0) (14.2, 6.2, 0, 0)
Minimum total consensus cost: 8.80 3.17 16.76