Table 6.
Construction cost variation preliminary estimation tool.
Factor | Minimum | Medium | Maximum |
---|---|---|---|
Complexity | −9% | SPOKE | 9% |
Beds | 3% | 450 | −3% |
Typology | −6% | Poly-block | 6% |
Localization | −12% | Calabria | 12% |
Technology | −5% | Medium | 5% |
Maintenance and Management | −36% | 30 | 45% |