Table A2.

Infrastructure costs.

In this section, it is required to insert a construction value in EUR/lm or EUR/sqm for each indicated category, according to own experience in hospital construction.
External viability (EUR/lm) Literature reference value: 800 EUR/lm
Distributive internal viability (EUR/lm) Literature reference value: 600 EUR/lm
White sewer line connection (EUR/lm) Literature reference value: 200 EUR/lm
Black sewer line connection (EUR/lm) Literature reference value: 300 EUR/lm
Water connection (EUR/lm) Literature reference value: 250 EUR/lm
Methane gas connection (EUR/lm) Literature reference value: 150 EUR/lm
Electrical connection (EUR/lm) Literature reference value: 100 EUR/lm
Telephone line connection (EUR/lm) Literature reference value: 60 EUR/lm
Interior lighting work (EUR/lm) Literature reference value: 350 EUR/lm
Pedestrian roads work (EUR/lm) Literature reference value: 300 EUR/lm
Green areas (EUR/sqm) Literature reference value: 40 EUR/sqm