Table 3.
Savings of rWGS and hypothetical savings with turnaround times extended to 7 and 14 days
3-day turnarounda |
7-day turnaround |
14-day turnaround |
||||
---|---|---|---|---|---|---|
Lowb | Highb | Low | High | Low | High | |
Cost savings for system | $2.2 m | $2.9 m | $1.7 m | $2.4 m | $1.1 m | $1.7 m |
Cost savings per child | $12,041 | $15,786 | $9,517 | $13,250 | $6,216 | $9,132 |
Actual rWGS turnaround time in this study.
Low and high calculations reflect the lower and upper estimates of changes in care.