Table 5.
kNN and f measure for the projects with only successful and failed outcomes.
| Accuracy: 82.79% ±2.06% (micro average: 82.79%) | |||||
|---|---|---|---|---|---|
| True 1 | True 2 | True 0 | True 3 | Class precision | |
| Pred. 1 | 681 | 102 | 13 | 9 | 84.60% |
| Pred. 2 | 40 | 274 | 8 | 22 | 79.65% |
| Pred. 0 | 0 | 0 | 0 | 0 | 0.00% |
| Pred. 3 | 1 | 1 | 3 | 2 | 28.57% |
| Class Recall | 94.32% | 72.69% | 0.00% | 6.06% | |