Skip to main content
. 2021 Jul 16;77:105669. doi: 10.1016/j.ultsonch.2021.105669

Fig. 2.

Fig. 2

Key elements of the test rig: 1 – RGHC, 2 – 3-phase asynchronous motor, controlled by variable frequency drive, 3 – pressure side throttling valve, 4 – 1000 L tank, 5 – suction side throttling valve, 6 – discharge valve. Measurement equipment: a – absolute pressure transducer, b – differential pressure transducer, c – electromagnetic flow meter, d – hydrophone, e – high-speed camera.