Skip to main content
. 2021 Jun 25;59(8):902–909. doi: 10.1038/s41393-021-00659-9

Fig. 4. SCIM follow-up (respiration & sphincter management).

Fig. 4

Boxplot illustrating the delta of SCIM-III and SCIM-III-SR items 6–8 overtime (y-axis [points]) grouped by the level of lesion (x-axis) as well as cumulated for all respondents (=total). Numbers included: item 6: n = 304 (NLI C1–C5 = 119, NLI C6-T1 = 35, paraplegia = 150); item 7: n = 294 (NLI C1–C5 = 120, NLI C6-T1 = 31, paraplegia= 143) item 8: n = 339 (NLI C1–C5 = 138, NLI C6-T1 = 35, paraplegia = 166).