. 2021 Aug 3;21(15):5246. doi: 10.3390/s21155246

Table 4.

Active power losses and operation costs for the 30-bus system with different optimization methods.

FACTS Method Active Power Losses Operation Costs after RP Planning
(×106)
Reduction in Active Power Losses Reduction in Operation Costs
(×106)
without the presence of FACTS devices The proposed method 0.0756 3.403 0.0024 1.5103
SPSO [98] 0.0684 3.5951 0.0027 1.41916
APSO [98] 0.0684 3.5966 0.0027 1.40416
EPSO [98] 0.0685 3.6000 0.0026 1.37016
with the presence of FACTS devices The proposed method 0.0431 2.3543 0.0279 1.38283
SPSO [98] 0.0435 2.3622 0.0276 1.37481
APSO
[98]
0.0434 2.3558 0.0277 1.38121
EPSO [98] 0.0438 2.3671 0.0273 1.36991