Skip to main content
. 2021 Aug 8;205:108236. doi: 10.1016/j.buildenv.2021.108236

Fig. 5.

Fig. 5

Allocations of desiccants in AC Mask: 1 pack of (5.00 ± 0.05) g desiccant on the cold side of heat sink (left) and 2 packs of (2.50 ± 0.05) g in average per each pack of desiccant on the upper wall of the mask frame (right).