Table 1.
Additional locations which are considered likely production sites of green ammonia
| Location | Country | Latitude | Longitude | PLCOA (USD/t) | Rated wind fraction (%) | Full load hour equivalent per year | HB load factor | Electrolyzer rated power (MW) | NH3 synthesis (MW) |
|---|---|---|---|---|---|---|---|---|---|
| Patagonia (Argentina) (Armijo and Philibert, 2020) | Argentina | −44.5 | −71 | 383 | 53 | 2850 | 67 | 930 | 67 |
| Callide (CSIRO, 2020) | Australia | −24.5 | 150.5 | 375 | 20 | 2375 | 78 | 2,310 | 79 |
| Eighty Mile Beach (Asian Renewable Energy Hub, 2020) | Australia | −20 | 120.5 | 551 | 12 | 1580 | 67 | 2,010 | 77 |
| Port of Pecem (Bellini, 2021) | Brazil | −3.5 | −39 | 329 | 0 | 2442 | 46 | 2,150 | 121 |
| Calama Valley (Armijo and Philibert, 2020) | Chile | −22 | −69 | 378 | 7 | 1684 | 63 | 2,450 | 90 |
| Patagonia (Chile) (Armijo and Philibert, 2020) | Chile | −52.5 | −71 | 298 | 84 | 4845 | 72 | 1,160 | 84 |
| Taltal (Armijo and Philibert, 2020) | Chile | −25 | −70 | 309 | 23 | 2370 | 76 | 2,220 | 80 |
| Eqianqi (Keating, 2020) | China | 41 | 109 | 352 | 0 | 2442 | 47 | 1,890 | 107 |
| Ain Beni Mathar (Ennassiri et al., 2019) | Morocco | 34 | −2 | 350 | 0 | 2106 | 47 | 1,730 | 99 |
| Boujdour (Ennassiri et al., 2019) | Morocco | 26 | −14 | 289 | 27 | 2788 | 79 | 1,500 | 67 |
| Laayoune (Ennassiri et al., 2019) | Morocco | 27 | −13 | 273 | 41 | 3349 | 78 | 1,580 | 76 |
| Ouarzazate (Ennassiri et al., 2019) | Morocco | 31 | −7 | 350 | 11 | 1946 | 69 | 1,920 | 78 |
| Tarfaya (Ennassiri et al., 2019) | Morocco | 28 | −12.5 | 291 | 35 | 2935 | 75 | 1,620 | 76 |
Electrolyzer and ammonia power demands are shown for a plant size with an average energy supply of 1 GW. Citations provide details surrounding the existing proposals for the use of those sites.