Skip to main content
. 2021 Aug 16;16(8):e0256268. doi: 10.1371/journal.pone.0256268

Fig 1. Interactions between predictors in top models.

Fig 1

T = Time. S = Staffing (overall). Sb = Staffing (between facilities). Sw = Staffing (within facilities). P = Productivity (overall). Pb = Productivity (between facilities). Pw = Productivity (within facilities).