Table 2.
Group mean (95% CIa) in AUD$ | Control | NPWT |
---|---|---|
Dressing costs | 260.16 (186.47–354.19) | 441.86 (380.15–521.00) |
Analgesia costs | 6.39 (4.30–10.52) | 4.49 (3.82–5.33) |
Acute labour costs | 276.79 (236.69–325.01) | 268.22 (227.11–316.91) |
Scar management costs | 31.54 (13.34–57.24) | 16.11 (4.37–34.51) |
Surgical costsb | 1094.13 (100.40–2673.49) | 173.01 (0.00–464.10) |
Total costs | 1669.01 (659.06–3269.16) | 903.69 (670.68–1234.74) |
a95% CI derived from bootstrap resampling (2000 replications) to represent distribution uncertainty.
bIncluding grafting and dressing changes under general anaesthetic for patients who underwent a theatre operation.