Table 3.
Risk for LTP based on ablation completeness
Predetermined SM (mm) | Assessment with Ablation-fitTM | |||||||
---|---|---|---|---|---|---|---|---|
100% SM | > 95% SM | > 90% SM | All ablations | |||||
Total (LTP) | % | Total (LTP) | % | Total (LTP) | % | Total (LTP) | % | |
10 | 8 (0) | 0 | 15 (0) | 0 | 31 (0) | 0 | 76 (9) | 11.8 |
9 | 9 (0) | 0 | 20 (0) | 0 | 34 (0) | 0 | 76 (9) | 11.8 |
8 | 13 (0) | 0 | 23 (0) | 0 | 43 (0) | 0 | 76 (9) | 11.8 |
7 | 14 (0) | 0 | 28 (0) | 0 | 48 (0) | 0 | 76 (9) | 11.8 |
6 | 18 (0) | 0 | 37 (0) | 0 | 57 (0) | 0 | 76 (9) | 11.8 |
5 | 34 (0) | 0 | 45 (0) | 0 | 63 (1) | 1.6 | 76 (9) | 11.8 |
4 | 43 (0) | 0 | 59 (1) | 1.7 | 69 (2) | 2.9 | 76 (9) | 11.8 |
3 | 55 (0) | 0 | 68 (2) | 2.9 | 71 (4) | 5.6 | 76 (9) | 11.8 |
2 | 70 (5) | 7.1 | 72 (5) | 6.9 | 74 (7) | 9.4 | 76 (9) | 11.8 |
1 | 73 (6) | 8.2 | 74 (7) | 9.4 | - | - | 76 (9) | 11.8 |
SM, safety margin