Skip to main content
. 2021 Sep 3;16(9):e0242586. doi: 10.1371/journal.pone.0242586

Table 1. Results of Tukey post hoc tests for multiple comparisons of ND means for the different road construction phases.

Comparison Estimate Std. Error z value Pr(>|z|)
Before-During 0.055 0.010 5.245 <0.001
Before-After 0.078 0.013 6.144 <0.001
During-After 0.023 0.008 2.872 <0.01