Skip to main content
. 2021 Sep 3;16(9):e0242586. doi: 10.1371/journal.pone.0242586

Table 3. Summary of median Nightly Distance (ND), Home Range (HR) size, Extra-Territorial Excursion (ETE) distance and frequency (fETE) during each phase of road construction.

Median ND (m) Median HR size (km2) Median ETE (m) Median fETE
Before road construction 651 0.87 90 0.16
Variation in annual median before road construction 551–640 0.72–1.13 90–142 0.13–0.16
During road construction 673 *** 0.97 (ns) 102 (ns) 0.13 (ns)
After road construction 848 *** 1.07 (ns) 91 (ns) 0.18 *

The variation in annual median in the ‘before’ phase is included in the second row for each movement metric. The statistical significance of differences between the ‘during’ and ‘after’ phases when compared with the ‘before’ phase are marked with asterisks (*** < 0.001, * < 0.05), while (ns) signifies no significant difference.