Table 3. Summary of median Nightly Distance (ND), Home Range (HR) size, Extra-Territorial Excursion (ETE) distance and frequency (fETE) during each phase of road construction.
Median ND (m) | Median HR size (km2) | Median ETE (m) | Median fETE | |
---|---|---|---|---|
Before road construction | 651 | 0.87 | 90 | 0.16 |
Variation in annual median before road construction | 551–640 | 0.72–1.13 | 90–142 | 0.13–0.16 |
During road construction | 673 *** | 0.97 (ns) | 102 (ns) | 0.13 (ns) |
After road construction | 848 *** | 1.07 (ns) | 91 (ns) | 0.18 * |
The variation in annual median in the ‘before’ phase is included in the second row for each movement metric. The statistical significance of differences between the ‘during’ and ‘after’ phases when compared with the ‘before’ phase are marked with asterisks (*** < 0.001, * < 0.05), while (ns) signifies no significant difference.