Table 2.
Dependent variable | Change in correct naming | Change in semantic errors | Change in phonological errors |
---|---|---|---|
R square | 0.616 | 0.425 | 0.158 |
Number of participants | 26 | 25 | 24 |
Predictors |
Mean kurtosis at baseline
|
Mean kurtosis at baseline
|
|
Non‐structural
| |||
Associations |
Change in mean kurtosis
|
Change in mean kurtosis
|
The dependent variable change in correct naming was calculated as ((correct at 1 week) − (correct at baseline))/(175 − (correct at baseline)) *100. The dependent variable change in semantic errors was calculated as ((percent semantic errors at 1 week) − (percent semantic errors at baseline)). The dependent variable change in phonological errors was calculated as ((percent phonological errors at 1 week) − (percent phonological errors at baseline)). The number in parenthesis indicates the beta coefficient for that variable in the model.