Skip to main content
. 2021 Sep 7:1–26. Online ahead of print. doi: 10.1007/s10479-021-04237-3

Table 8.

Four levels of the budget parameters used in M2_Adjusted

Level 1 (M1) Level 2 Level 3 Level 4 (M2)
Tc 0 45,900 91,800 137,700
Tijs 0 15,300 30,600 45,900
Tiks 0 1530 3060 4590