Skip to main content
. 2021 Aug 25;9:722927. doi: 10.3389/fpubh.2021.722927

Figure 3.

Figure 3

A schematic of the cost-effectiveness plane. Panel A indicates the four different quadrants. Panel B illustrates the different decision rules in relation to a cost-effectiveness threshold within the different quadrants.