Skip to main content
. 2021 Aug 30;21(17):5824. doi: 10.3390/s21175824

Table 3.

Implementation results of described works.

Work Curve Tech
[µm]
Area
[Gate]
Power
[µW]
Cycles Energy
[µJ]
Batina [25] B-131 d = 1 0.18 6718 Under 30 210,600 -
d = 2 7191 109,200
d = 3 7645 74,880
d = 4 8104 57,720
B-163 d = 1 0.18 8214 - 353,710 -
d = 2 8791 182,071
d = 3 9368 124,858
d = 4 9926 95,159
Lee [103] B-163 d = 1 0.13 12,506 36.63 275,816 8.94
d = 2 14,064 21.55 144,842 5.29
d = 3 14,729 15.75 101,183 3.88
d = 4 15,356 12.08 78,544 2.94
Wenger [26] B-163 UMC L130 8958 32.34 286,000 9.25
Wenger [27] Ar1 B-163 0.13 14,167 49.1 7,216,905 354.3
Ar2 11,778 93.8 342,724 32.1
Ar3 4114 66.1 467,370 30.9
Roy [106] K-283 0.13 4323 6.11 1,566,000 9.56