Skip to main content
. 2021 Jul 17;185:115594. doi: 10.1016/j.eswa.2021.115594

Table 14.

The final results of implementing the VIKOR method.

Alternative S R Q Prioritization
S R Q
AP1 0.439 0.186 0.697 6 6 6
AP2 0.11 0.055 0 1 1 1
AP3 0.494 0.18 0.731 7 7 7
AP4 0.299 0.118 0.363 3 3 3
AP5 0.403 0.186 0.664 5 5 5
AP6 0.193 0.086 0.169 2 2 2
AP7 0.719 0.281 1 8 8 8
AP8 0.248 0.153 0.438 4 4 4