Skip to main content
. 2021 Aug 10;40(24):5351–5372. doi: 10.1002/sim.9129

TABLE 4.

Realized values of the discrepancy measures according to Models 7 and 8 for the forecasted cases in Italy and posterior p‐values over a period of 10 days

Model 7 Model 8
Day
Dist^t
Dist˜t
p‐value
Dist^t
Dist˜t
p‐value
25th April 18.971 9.128 0.202 7.383 23.344 0.769
26th April 200.800 16.790 0.003 60.573 44.372 0.403
27th April 596.703 23.242 0.000 2200.393 63.880 0.198
28th April 1202.657 28.746 0.000 335.829 81.942 0.161
29th April 2222.529 33.588 0.000 505.395 98.120 0.137
30th April 2664.510 37.776 0.000 434.868 113.028 0.164
1st May 4779.427 41.501 0.000 658.215 127.831 0.118
2nd May 8358.893 44.679 0.000 929.957 140.980 0.103
3rd May 13544.235 47.837 0.000 1219.478 153.172 0.095
4th May 21402.362 51.219 0.000 1767.593 165.840 0.069