Table 9.
The amount of metal waste produced by each node.
t = 1 | t = 2 | t = 3 | t = 4 | |
---|---|---|---|---|
m = 1 | 0 | 0 | 0 | 0 |
m = 2 | U(15,20) | U(22,26) | U(30,33) | U(18,22) |
m = 3 | U(23,26) | U(31,35) | U(13,17) | U(18,21) |
m = 4 | U(27,34) | U(37,40) | U(21,25) | U(19,22) |
m = 5 | U(18,25) | U(22,25) | U(33,36) | U(40,43) |
m = 6 | U(32,36) | U(28,31) | U(19,25) | U(13,17) |
m = 7 | U(15,19) | U(29,33) | U(20,22) | U(24,28) |
m = 8 | U(40,49) | U(37,42) | U(14,19) | U(25,29) |
m = 9 | U(38,45) | U(30,33) | U(23,27) | U(19,22) |
m = 10 | U(13,16) | U(24,28) | U(17,24) | U(21,28) |
m = 11 | U(22,26) | U(25,27) | U(19,23) | U(33,36) |
m = 12 | U(30,35) | U(39,43) | U(11,16) | U(21,28) |
m = 13 | U(27,34) | U(33,36) | U(20,22) | U(24,29) |
m = 14 | U(9,12) | U(15,18) | U(31,34) | U(32,37) |