I: | number of days from baseline to when the order was introduced (i.e., introduced date-baseline date). |
E: | number of days before the order was lifted since it was introduced (i.e., expiration date – introduced date). |
I: | number of days from baseline to when the order was introduced (i.e., introduced date-baseline date). |
E: | number of days before the order was lifted since it was introduced (i.e., expiration date – introduced date). |