Classroom Configuration Doors and Windows Opening Combinations
B1-A1 C-1 All windows opened and main door opened.
C-2 End windows opened and main door opened.
C-3 Only windows at the end in west façade opened, the centre windows in east façade opened (“Y” configuration) and the main door opened.
B1-A2 C-1 All windows opened, main door opened and the corridor windows opened.
C-2 All windows opened, main door opened and the corridor windows closed.
C-3 Only the windows at the end opened and main door opened, and the corridor windows opened.
B2-A1 C-1 All windows opened and two doors opened.
C-2 All windows opened and main door opened.
C-3 Only windows at the end opened and main door opened.
B2-A2 C-1 All windows opened and the two doors opened.
C-2 All windows opened and the main door opened.
C-3 Only windows at the end and the main door opened.