Table 5.
Parameter estimates for FCM.
Estimates | S.E. | Est./S.E. | Two tailed P-value | |
---|---|---|---|---|
I-TEI by I-WB | 1.000 | 0.000 | 999.000 | 999.000 |
I-TEI by I-SC | 0.780 | 0.051 | 15.278 | 0.000 |
I-TEI by I-EM | 0.816 | 0.049 | 17.123 | 0.000 |
I-TEI by I-SO | 0.851 | 0.052 | 15.582 | 0.000 |
S-TEI by S-WB | 1.000 | 0.000 | 999.000 | 999.000 |
S-TEI by S-SC | 0.780 | 0.058 | 15.278 | 0.000 |
S-TEI by S-EM | 0.816 | 0.049 | 17.123 | 0.000 |
S-TEI by S-SO | 0.851 | 0.052 | 15.582 | 0.000 |
I-WB with S-WB | 0.008 | 0.008 | 6.200 | 0.012 |
I-SC with S-SC | 0.047 | 0.006 | 2.333 | 0.018 |
I-EM with S-EM | 0.173 | 0.007 | 2.428 | 0.211 |
I-SO with S-SO | 0.121 | 0.005 | 2.400 | 0.198 |
I-TEI with S-TEI | 0.238 | 0.008 | 2.625 | 0.000 |
Means | ||||
I-TEI | 5.216 | 0.054 | 9.659 | 0.000 |
S-TEI | 0.632 | 0.048 | 11.712 | 0.001 |
Variances | ||||
I- TEI | 0.192 | 0.034 | 6.205 | 0.000 |
S- TEI | 0.004 | 0.003 | 1.667 | 0.000 |
Residual variances | ||||
I-WB | 0.052 | 0.021 | 2.468 | 0.000 |
S-WB | 0.002 | 0.014 | 0.142 | 0.001 |
I-SC | 0.019 | 0.004 | 4.68 | 0.032 |
S-SC | 0.000 | 0.000 | 1.211 | 0.041 |
I-EM | 0.048 | 0.017 | 2.841 | 0.005 |
S-EM | 0.013 | 0.008 | 1.632 | 0.000 |
I-SO | 0.027 | 0.021 | 1.284 | 0.139 |
S-SO | 0.009 | 0.006 | 1.500 | 0.127 |
R-square | ||||
I-WB | 0.901 | 0.042 | 18.184 | 0.000 |
S-WB | 0.912. | 0.048 | 15.132 | 0.000 |
I-SC | 0.614 | 0.059 | 10.384 | 0.000 |
S-SC | 0.598 | 0.019 | 31.456 | 0.000 |
I-EM | 0.764 | 0.048 | 18.741 | 0.000 |
S-EM | 0.726 | 0.057 | 16.317 | 0.000 |
I-SO | 0.794 | 0.072 | 11.027 | 0.000 |
S-SO | 0.758 | 0.074 | 10.246 | 0.000 |