Skip to main content
. 2021 Sep 13;12:723884. doi: 10.3389/fpsyg.2021.723884

Figure 2.

Figure 2

Multiple regression analysis with the total work engagement score as a dependent variable and PM, MM, and GG as independent variables (step 1); changeRadj2 after incorporating the control variables (step 2). Radj2 = R2 adjusted; changeRadj2 = change in R2 adjusted; *p < 0.05; **p < 0.01.