Skip to main content
. Author manuscript; available in PMC: 2021 Sep 27.
Published in final edited form as: Brain Stimul. 2020 Mar 19;13(3):863–872. doi: 10.1016/j.brs.2020.03.009

Fig. 4.

Fig. 4.

Mean completion times in seconds for the bM1 (green), SMA (orange), and sham (grey) groups at pre-test and post-test. Whiskers denote 95% confidence intervals.