Skip to main content
. 2021 Sep 17;47:102133. doi: 10.1016/j.redox.2021.102133

Fig. 6.

Fig. 6

Model calculation of H2O2 release by PMN.Using the model of Murphy and DeCoursey we calculated the H2O2 production from the model lasting 90 minutes. The model doesn't predict termination of the H2O2 release of PMN. Not even under conditions simulating proton channel inhibition with 1 mM zinc. Corresponding to our experiments the model predicts an initial delay but does not capture the H2O2 release correctly over a longer period of time.