Table 2.
Validation scenario.
| Experiment | Expected days, n | Error, mean (SD) |
| 1 | 9 | –1.70 (4.51) |
| 2 | 9 | –1.37 (5.01) |
| 3 | 9 | –1.02 (4.16) |
| 4 | 10 | –1.84 (7.31) |
| 5 | 10 | –1.39 (4.82) |
| 6 | 9 | –1.73 (5.22) |
| 7 | 8 | –1.31 (4.28) |
| 8 | 9 | –0.89 (4.59) |
| 9 | 10 | –2.41 (6.45) |
| 10 | 10 | –1.30 (4.50) |
Validation scenario.
| Experiment | Expected days, n | Error, mean (SD) |
| 1 | 9 | –1.70 (4.51) |
| 2 | 9 | –1.37 (5.01) |
| 3 | 9 | –1.02 (4.16) |
| 4 | 10 | –1.84 (7.31) |
| 5 | 10 | –1.39 (4.82) |
| 6 | 9 | –1.73 (5.22) |
| 7 | 8 | –1.31 (4.28) |
| 8 | 9 | –0.89 (4.59) |
| 9 | 10 | –2.41 (6.45) |
| 10 | 10 | –1.30 (4.50) |