Table 3.
Retention Rates by CBO, CBOP-3MV Project, 2009–2011
CBO A | CBO B | CBO C | All CBOs | |
---|---|---|---|---|
n=198 | n=213 | n=48 | n=459 | |
Completed follow-up 1 | 149 (75.3 %) | 126 (59.2 %) | 35 (72.9 %) | 310 (67.5 %) |
Completed follow-up 2 | 159 (80.3 %) | 131 (61.5 %) | 36 (75.0 %) | 326 (71.0 %) |
Completed both follow-up 1 and 2 | 135 (68.2 %) | 92 (43.2 %) | 29 (60.4 %) | 256 (55.8 %) |
Did not complete either follow-up 1 or 2 | 25 (12.6 %) | 48 (22.5 %) | 6 (12.5 %) | 79 (17.2 %) |